 | Customer ResponsibilitiesPrimeTECH Handling Requirements
        
          All PrimeTECH products require a field coat.
          The product must be kept dry—preferably in the garage or some
            other permanent cover. The Lumber bag is not designed to keep the
            product completely dry. The product must be stored above ground so
            that air can circulate under it.
          The product must be installed over a dry sheathing or substrate.
            Moisture content should be 15% or below. If in doubt, use 
      moisture meter to check.
          If the wood component of your product has knots they may bleed.
            If BIN has been used to seal, be sure to install with BIN side exposed
            to the weather. Note: Usually some knots require additional
            BIN before applying the top coat.
          If you see "extractive bleeding" refer to our helpful
            hints Tell me more about
            extractive bleeding on exterior wood siding.
          Inspect the color and the exposed face. If you are not happy, call
            us prior to installing the product as we are happy to fix the problem.
            Once the product is installed we are no longer responsible for aesthetic
            defects to the product.
     PrimeTECH, Churchill Coatings Corp., PO Box 309, 2 Grafton
        Common, Grafton, MA 01519Telephone: 800-458-5775 / Fax: 508-839-9239 / Internet: www.GoPrimeTECH.com
 Sales: sales@GoPrimeTECH.com / Customer
          Care: customercare@GoPrimeTECH.com
 
   |   |